Selection criteria
Selection criteria (sometimes referred to as award criteria or evaluation criteria) are lists of items against which a prospective supplier can be assessed before a selection is made and a contract awarded. They might also be used to help identify suitable individuals when seeking new employees.
Defining specific selection criteria can help an employer agree among themselves the characteristics that they value. This helps ensure they identify the best value submission, rather than simply the lowest price submission. When the employer is evaluating submissions, referring to the selection criteria, or perhaps even giving marks against each criteria can help focus the assessment and prevent it being dominated by personal preferences or by forceful individuals.
Informing applicants what the selection criteria are can create a fairer process, enabling applicants to consider in advance whether they are suitable, and helping them tailor their submissions. It also makes the application process more transparent and so less open to challenge.
Assessment criteria will vary significantly depending on the nature of the role; whether it is for a consultant, contractor, other supplier or employee, however, some typical criteria might include:
- Price.
- Relevant experience.
- Understanding of the requirements.
- Past performance.
- Technical skills.
- Availability.
- Management skills.
- Proposed methodology.
- Compliance with the requirements of the submission process.
- Financial standing.
The criteria may be weighted to reflect how important they are to the client. Each submission is then given a score against each criteria. Submissions might be scored by a number of assessors, or different assessor might score different criteria.
The overall score for a submission can be calculated by multiplying the score for each criteria by its weighting and then adding together or averaging the results for each assessor. Where there are very different scores between assessors, a meeting might be held to discuss the reasons.
More complex assessments might include additional benchmarks. For example, there may be certain criteria that are straight-forward pass/fail issues. There may also be criteria for which a very low rating is unacceptable irrespective of scores for other criteria.
[edit] Related articles on Designing Buildings Wiki
- Accelerated debrief.
- Adversarial behaviour in the UK construction industry.
- Appointing consultants.
- Auction theory.
- Best value.
- Best value procurement.
- Bid evaluation.
- Competitive procedure with negotiation.
- Due diligence when selecting contractors or subcontractors.
- Innovative partnership procedure.
- Invitation to tender.
- Most Economically Advantageous Tender (MEAT).
- Pre qualification questionnaire.
- Procurement route.
- Tender evaluation.
- Tender price appraisal.
- The benefits of e-procurement in construction.
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.